Fitting that this post comes on the 100th day of working on this build. I finally have a rolling chassis!
I finished the upper a-arm and shock mounts on the driver side and installed the rear end. I don't have shock mounts on the rear yet, but a couple of well placed pieces of wood took care of that. Once I got the front suspension together, I just had to get the wheels on and roll the thing out of the garage. Definitely an exciting day for me.
Now I'm just trying not to think of everything that's left...
Friday, July 13, 2012
Wednesday, July 11, 2012
D99: Scuttel & Upper A-Arm
I've been dying to get an idea of what this car will eventually look like, so I threw some spare wood together to build a scuttle mock up. I'm still deciding what I'm going to build the scuttle out of in the end, but for now, at least I can picture it.
I also rebuilt the upper a-arms. I had to do this to mount them to the new geometry created by rebuilding the front end. Below is the new design built out. It's not as easy to adjust, but it gives more space for the shock and of course, works with the frame redesign.
Oh, and I built some shock mounts. I'm not finalized on the placement of the upper mount yet, but it'll do for now.
I also rebuilt the upper a-arms. I had to do this to mount them to the new geometry created by rebuilding the front end. Below is the new design built out. It's not as easy to adjust, but it gives more space for the shock and of course, works with the frame redesign.
Oh, and I built some shock mounts. I'm not finalized on the placement of the upper mount yet, but it'll do for now.
Thursday, July 5, 2012
D98: Shifter & Engine Bay Bracing
I finally got around to working on the shift linkage. I've been wanting to get this done for while, or at least try it out to see if the design would work. I realized after the first engine fit that the shift linkage was too short and needed to be moved further back. Here is what I've got so far. I cut the original linkage and extended it by about 4 inches. The new shift lever uses a couple pieces of 3/4" .120 wall DOM tubing with a 1/2" bolt to hold them together. The pivot is a 3/4" heim joint.
One thing I like about this design is that I can adjust how short the "throw" is by unscrewing the bolt to change the motion ration.
I also got around to adding some extra bracing to the engine bay. The top pic is a removable brace that goes over the transmission tunnel. This makes it much easier to get the engine in and out. The bottom pic is the brace on the drivers side of the engine bay. I also added one to the passenger side as well.
I also got around to adding some extra bracing to the engine bay. The top pic is a removable brace that goes over the transmission tunnel. This makes it much easier to get the engine in and out. The bottom pic is the brace on the drivers side of the engine bay. I also added one to the passenger side as well.
Thursday, June 28, 2012
D96-97: Front End Rebuild + Radiator Mounts
I've never been happy with the front uprights I had, so I decided to rebuild these. Below is the new set. Now, both uprights are 1 1/2" square 1/8" tube instead of the normal 1" 16awg. This should provide plenty of strength to the upper a-arm mounts. If (big if) I keep the upper mounts in single shear, these will provide a much stronger mounting point and should hold up better to the torsional load created.
I haven't added the 3/4" DOM tube yet, but the front and back will now be in-line. I haven't figured out how to modify the upper a-arm yet. With the two mounts being in-line, I need to figure out the best way of using the heim joints without maxing out their travel. With the old design they were already close to being maxed out. I might just have to settle for less points of adjustment.
I've also got the radiator mounted to the new uprights. I'm still using the factory BMW radiator and mount points. However, I'm mounting from the rear instead of the front of the radiator.
The last piece of progress was finally adding some supports to top level of the frame in the engine bay. This is also a better view of the radiator upper mounts.
I haven't added the 3/4" DOM tube yet, but the front and back will now be in-line. I haven't figured out how to modify the upper a-arm yet. With the two mounts being in-line, I need to figure out the best way of using the heim joints without maxing out their travel. With the old design they were already close to being maxed out. I might just have to settle for less points of adjustment.
I've also got the radiator mounted to the new uprights. I'm still using the factory BMW radiator and mount points. However, I'm mounting from the rear instead of the front of the radiator.
The last piece of progress was finally adding some supports to top level of the frame in the engine bay. This is also a better view of the radiator upper mounts.
Wednesday, June 20, 2012
D93-95: Floor + Welding + Update
I'm back! After 3 months of training, Ride the Rockies has come and gone. Turned into a shorter week than planned because of a knee injury, but still had 4 good days and 300 miles on the bike.
Here's a pic of my brother and I at the top of Independence Pass. This was after 6000 ft of climbing, most in the last 15 mi. I've been wanting to climb this pass for years and was excited to finally get the chance.
On to the build progress. I've spent a little time over the past few days getting the floor finished and working on finish welding the frame. I'd say I'm 95% complete on welding... but I keep finding more that needs to be finished.
I'm also working on the upper a-arm support to eliminate the "single shear" in the current design and figuring out where the shocks are going to mount.
Here's a pic of my brother and I at the top of Independence Pass. This was after 6000 ft of climbing, most in the last 15 mi. I've been wanting to climb this pass for years and was excited to finally get the chance.
On to the build progress. I've spent a little time over the past few days getting the floor finished and working on finish welding the frame. I'd say I'm 95% complete on welding... but I keep finding more that needs to be finished.
I'm also working on the upper a-arm support to eliminate the "single shear" in the current design and figuring out where the shocks are going to mount.
Wednesday, April 25, 2012
D91-92: Floor
I know I haven't been posting much recently, but training has been taking over my time. I've also been working on a new bike rack for my daily driver. Maybe I can post on that later.
Here's a quick update on the the last couple days of work. I've been collecting 16 awg sheet for a while now every time I go to the yard for scrap. I miscalculated a little and ended up with enough for 3/4 of a floor. I know it's likely overkill, but I'll feel comfortable knowing nothing is going to pop through while driving. Plus, if you are going to add extra weight, might as well be as low as possible. I've fully welded one side, and will weld 1" sections on the top side as well. I'm still trying to figure out how to best eliminate the "bong".
With the frame upside down, I've taken the opportunity to continue finish welding the frame. It always surprises me how much time it takes to finish weld everything.
On a random note, I found out that a guy I work with used to run a fiberglass shop in another life and offered to help whenever I get to the body work.
On a random note, I found out that a guy I work with used to run a fiberglass shop in another life and offered to help whenever I get to the body work.
Wednesday, April 4, 2012
D88-90: Firewall v2 + Unpowered Brakes
I haven't had a chance to post from the last few days in the garage, so here's a quick update. I've wanted to redo the upper firewall for the driver side since the first one went in. Here is my second go around. I think it turned out much cleaner. I also moved the mount for the steering shaft up a little bit to simplify the final weld and move the steering u-joint away from the engine mount.
After removing the brake booster, the master cylinder sat a little close to the firewall. I build a "shim" to move it out by about 3/8".
Here is the new firewall with everything attached. I'm so much happier with the way this version turned out.
With the brake booster removed, I had to shorten the push rod from the pedal to the master cylinder. Here is the shortened version.
Below is the brake pedal with the new push rod installed. Now I just need to figure out how to make sure that the brake pedal doesn't swing back and the push rod come out. This was all held in place by brake booster before. Oh, and I hope that I don't need that booster. Ha.
After removing the brake booster, the master cylinder sat a little close to the firewall. I build a "shim" to move it out by about 3/8".
Here is the new firewall with everything attached. I'm so much happier with the way this version turned out.
With the brake booster removed, I had to shorten the push rod from the pedal to the master cylinder. Here is the shortened version.
Below is the brake pedal with the new push rod installed. Now I just need to figure out how to make sure that the brake pedal doesn't swing back and the push rod come out. This was all held in place by brake booster before. Oh, and I hope that I don't need that booster. Ha.