The tube holder device thingy.
The front tube and ball joint sleeve mocked up.
The finished product installed.
Both sides finished. One with a ball joint installed.
Lower a-arm with spindle installed.
I am much happier with the second iteration of the a-arm design.
A quick note here. Use a threaded rode when mocking up the bushing sleeves before tacking them in place. This will ensure they are straight and won't bind with travel. I thought I had a decent jig setup until I installed the arm on the frame with the rear mount loose and realized the mount moved when rotating the arm. Turns out the bushing sleeves weren't in line.
No comments:
Post a Comment